Ujh Multipurpose Project and India’s Eastern River Waters

A project first conceived nearly a century ago is finally moving forward. The Ujh Multipurpose Project sits on a river India was always entitled to fully use. For decades, that water simply flowed on into Pakistan instead.

A hydroelectric dam, illustrating the Ujh Multipurpose Project
The Ujh Multipurpose Project will combine power generation, irrigation and drinking-water supply. Photo: Koyna hydroelectric dam, CC BY-SA 3.0.
mcqquestion.com Ujh: A Century-Old Project, Revived
IndGov0054
A river India was always entitled to use, finally put to work.
186-212 MW
Power Generated
designed capacity
90,000 ha
Irrigated
Kathua, Samba, Pathankot, Gurdaspur
Rs 11,000 Cr
Tentative Cost
National Project since 2008
Eastern River
Ravi Tributary
Ujh is India’s own river
~1920s
First Conceived
a century-old idea
2 Aug 2026
Reviewed
phased rollout confirmed
186-212 MW of power, 90,000 hectares irrigated.
⬇ Download as image
📑 Contents
Must Know

The Ujh Multipurpose Project

What the Ujh Project Is
  • PlaceIt sits in Kathua district, Jammu & Kashmir, on the Ujh River.
  • RiverUjh is a main tributary of the Ravi River.
  • TypeIt is a multipurpose project, for power, irrigation and water supply.
The Eastern Rivers
  • Full formThe 1960 Indus Waters Treaty governs the six rivers of the Indus system.
  • EasternRavi, Beas and Sutlej are the Eastern Rivers, allocated to India for unrestricted use.
  • WesternIndus, Jhelum and Chenab are the Western Rivers, allocated mainly to Pakistan.
  • SoUjh sits on a river India was fully entitled to use.
What It Will Do
  • PowerIt is designed to generate 186–212 MW of electricity.
  • IrrigationIt would irrigate nearly 90,000 hectares across Kathua and Samba in J&K.
  • More landIt also serves Pathankot and Gurdaspur in Punjab.
  • WaterIt will supply drinking water to Kathua district and support industry.
  • Full formMW is megawatt, a unit of electric power.
Who Is Building It
  • BodyWAPCOS Ltd is implementing the project.
  • Full formWAPCOS is Water and Power Consultancy Services, a Government of India undertaking.
  • MinistryIt sits under the Ministry of Jal Shakti.
  • StatusThe project was declared a National Project in 2008.
  • CostIts tentative cost is around ₹11,000 crore.
Good to Know

Why It Took a Century

Why It Took a Century
  • OriginThe Ujh project was first conceived in the ~1920s.
  • DelayIt stayed stalled for decades, even though India was always legally entitled to the water.
  • LessonLegal right alone did not build the dam.
The Shahpurkandi Dam
  • CompanionShahpurkandi is a related dam on the Ravi system.
  • DelayIt faced a similar delay of about three decades.
  • FinishPunjab’s Chief Minister inaugurated it on 5 November 2025.
  • LiveNew irrigation channels went live in July 2026.
Water Flowing to Pakistan
  • ProblemBecause these projects sat unfinished, Ravi water India was entitled to use kept flowing to Pakistan.
  • SoCompleting them changes where that water goes.
A Security Dimension
  • BackingThe Ministry of Home Affairs backs the project partly for security.
  • PurposeIt aims to restrict unregulated water flows and close vulnerable infiltration routes.
Phased Execution
  • PlanThe project will be executed in phases.
  • ApproachConstruction will begin while land acquisition continues, not after it.

Test Yourself

1. The Ujh Multipurpose Project is located in which district of Jammu & Kashmir?

 

Great to Know

What Ujh Signals

A Wider Pattern
  • PatternUjh is part of long-delayed water infrastructure now being pushed forward.
  • LawArticle 262 provides machinery for inter-state river-water disputes within India.
  • LinkSee the related article for how India settles such conflicts at home.
What Ujh Signals
  • IdeaA project can sit dormant for a century and still matter enormously once revived.
  • LessonInfrastructure delay is rarely just an engineering problem.
  • ConsequenceIt has real diplomatic and security consequences too.
Current Affairs

📰 Current Affairs

The August 2026 Review
  • EventOn 2 August 2026, Dr Jitendra Singh reviewed the project’s status and phased roadmap with WAPCOS officials.
  • PointHe noted Ravi was India’s major Eastern River even while the treaty was in force.
  • StatusHe confirmed the treaty remains in abeyance.
  • SourceMorning Kashmir.
The Treaty in Abeyance
  • EventOn 3 July 2026, the MEA reaffirmed the treaty is in abeyance.
  • ConditionIt holds until Pakistan credibly and irrevocably ends support for cross-border terrorism.
  • OptionIndia said it retains the option of exiting the treaty entirely.
  • Full formMEA is the Ministry of External Affairs.
  • SourceThe Tribune.
The Hague Award
  • EventOn 15 May 2026, the Court of Arbitration at The Hague issued a supplemental award on “maximum pondage.”
  • RulingIt broadly favoured Pakistan’s position.
  • RejectionIndia rejected the award as “null and void.”
  • StandIndia says it does not recognise the Court as legally constituted, and the treaty’s abeyance stands.
  • SourceAll India Radio / Newsonair.
PYQ

Exam Point of View

MCQ Questions
  • ScopeUjh, the Indus Waters Treaty and Eastern/Western Rivers appear in UPSC and other competitive exams.
Written Answer Questions
  • ThemeWater-sharing and river governance are recurring GS-II and GS-III themes.