Bhutan sells India more electricity than almost anything else it exports. This partnership began with a single dam in 1974. On 7 August 2026, both countries reviewed a relationship that now spans several major hydropower projects.

mcqquestion.com One Dam Becomes a Grid
IntlRel0072
1974
Chukha Agreement
First hydropower pact signed
1987
Chukha Commissioned
336 MW, Bhutan’s first mega plant
28 Aug 2025
Punatsangchhu-II Done
1,020 MW, capacity up ~40%
7 Aug 2026
Ministers Meet
4 projects reviewed
60:40 grant-to-loan: the financing formula India has used for Bhutan’s flagship hydropower plants, from Chukha to Tala.
⬇ Download as image
📑 Contents

Timeline

  • 1974: India and Bhutan sign their first hydropower agreement, to build the Chukha project.
  • 1987: Chukha (336 MW) is commissioned. It is Bhutan’s first mega power project.
  • 28 August 2025: Punatsangchhu-II (1,020 MW) is completed. It lifts Bhutan’s total power capacity by about 40%.
  • 7 August 2026: Power ministers from both countries meet in New Delhi to review hydropower cooperation.

Must Know

  • Hydropower is the cornerstone of India-Bhutan relations. India funds, builds, and buys power from joint projects on Bhutan’s rivers.
  • Chukha (336 MW), commissioned in 1987, was Bhutan’s first mega hydropower project. It followed a bilateral agreement signed in 1974.
  • Later joint projects include Kurichhu (60 MW), Tala (1,020 MW), and Mangdechhu (720 MW).
  • Punatsangchhu-II (1,020 MW) was completed on 28 August 2025. It raised Bhutan’s total installed power capacity by around 40%, to over 3,500 MW.
  • These projects are typically funded on a 60% grant, 40% loan basis from India, a distinctly generous model compared to purely commercial financing.

Good to Know

  • Surplus power from Chukha, Tala, and Mangdechhu is exported to India. It mainly supplies eastern and northern Indian states.
  • Hydropower exports are Bhutan’s single largest source of revenue and foreign exchange, making this partnership central to Bhutan’s own economy, not just India’s power supply.
  • Punatsangchhu-I (1,200 MW) and Kholongchhu (600 MW) are still under construction, alongside the newer Sankosh project.
  • The Mangdechhu Hydroelectric Project won the prestigious Brunel Medal in 2020, an international award recognising excellence in infrastructure and engineering.
  • Cooperation now extends beyond hydropower alone. It also covers renewable energy, cross-border electricity trade, and transmission connectivity.

Test Yourself

1. On 7 August 2026, India’s Union Power Minister Manohar Lal met which Bhutanese minister to review power sector cooperation?

 

Great to Know

Current Affairs

  • 7 August 2026: India’s Union Power Minister Manohar Lal met Bhutan’s Minister of Energy and Natural Resources, Lyonpo Gem Tshering, in New Delhi. (Source: PIB, Ministry of Power)
  • 7 August 2026: The Ministers specifically discussed Punatsangchhu-I, Punatsangchhu-II, Sankosh, and Chukha, along with cross-border electricity trade and renewable energy. (Source: PIB, Ministry of Power)
  • 28 August 2025: Punatsangchhu-II’s final unit was synchronised with the power grid, completing the 1,020 MW project and lifting Bhutan’s capacity by about 40%. (Source: The Tribune)