Author: Alley · Updated: 1 Nov 2026 · Sources & corrections

At a glance
Four points to fix in your head
13 October 2021
Launch date. Cabinet approval came on 21 October 2021.
7 engines, 6 pillars
Engines are sectors. Pillars are planning principles.
EGoS, NPG, TSU
Three institutional levels. The NPG evaluates but does not sanction.
6 October 2026
Cabinet approved ITLA as a special purpose vehicle.
More to read
- What is PM Gati Shakti, and why was it launched?
- What are the seven engines of PM Gati Shakti?
- What are the six pillars, and how do they differ from the engines?
- How does the digital platform work, and who built it?
- Who reviews a project under PM Gati Shakti?
- How many projects has the NPG evaluated, and what do the numbers mean?
- How does PM Gati Shakti link with the National Logistics Policy?
- What are the district and public versions of the platform?
- What changed in October 2026?
- Which distinctions do exams test?
1What is PM Gati Shakti, and why was it launched?
PM Gati Shakti is India’s National Master Plan for multimodal connectivity. “Multimodal” means using more than one transport mode, such as road, rail and ports, in one chain. The plan puts infrastructure information on one shared digital platform. Ministries and states can then plan connected projects together.
Prime Minister Narendra Modi launched it on 13 October 2021. The Cabinet Committee on Economic Affairs approved the plan and its institutional framework on 21 October 2021. Keep these two dates apart. Launch came first. Approval followed eight days later.
Why was it needed? Departments often planned their own projects alone. This can cause delays and repeated construction work. Picture a road laid in March and dug up again in June for a pipeline. A shared map lets both teams see the clash before work starts.
The plan also incorporates existing schemes. These include Bharatmala, Sagarmala, UDAN, inland waterways and dry or land ports. It helps planners spot missing links and compare routes by time and cost.
A common mistake is to think Gati Shakti replaced these schemes. It did not. It coordinates them. Each scheme keeps its own role. (Source: PIB, Cabinet approval.)
True or False: The Cabinet approved PM Gati Shakti on the same day it was launched.
2What are the seven engines of PM Gati Shakti?
The Union Budget 2022–23 named seven engines that drive the plan. They are roads, railways, airports, ports, mass transport, waterways and logistics infrastructure. These are the sectors being joined together.
| Engine | What it covers |
|---|---|
| Roads | Highways and the links that feed them. |
| Railways | Freight and passenger lines. |
| Airports | Air links for people and cargo. |
| Ports | Sea gateways and their road and rail access. |
| Mass transport | City systems such as metro lines. |
| Waterways | Inland water routes. |
| Logistics infrastructure | Sites that store, sort or move goods. |
Four other areas play a supporting role. They are energy transmission, IT communication, bulk water and sewerage, and social infrastructure. They support the seven engines. They are not engines themselves.
Here is a simple example. A factory needs a road, a rail yard and steady power. The three engines of road, rail and logistics must meet at one place. Power transmission supports them. A map showing all of these at once helps the planner.
The exam trap is the count. Seven is the number of engines. Do not mix it with the six pillars, which come next. (Source: PIB, Union Budget 2022–23.)
True or False: Mass transport is one of the seven engines of PM Gati Shakti.
3What are the six pillars, and how do they differ from the engines?
The launch framework lists six pillars. They are planning principles. They describe how a project should be planned. The seven engines describe what is being connected.
| Pillar | Plain meaning |
|---|---|
| Comprehensiveness | Existing and planned departmental work sits on one portal. |
| Prioritisation | Cross-sector interaction sets which project comes first. |
| Optimisation | Planners find gaps and pick suitable routes. |
| Synchronisation | Departments coordinate their work. |
| Analytical | GIS data and spatial tools support planning. |
| Dynamic | Project updates and progress monitoring stay current. |
Think of cooking a meal. The engines are the dishes. The pillars are the method: plan the menu, time the stove, and check as you go. A method is not a dish.
The pillars are not six new schemes. No money is attached to a pillar. They are ideas that every project on the platform should follow.
Exams like to swap the two lists. Remember the pair: seven engines are sectors, six pillars are principles. (Source: PIB, launch framework.)
Think it through: which pillar would catch a clash?
Two departments plan works on the same road in the same year. Which pillar helps most: Comprehensiveness, Synchronisation or Dynamic? Explain your choice in two sentences. This is a teaching exercise, not a real case.
4How does the digital platform work, and who built it?
The platform is a GIS, short for Geographic Information System. A GIS places facts on map layers. One layer may show rail lines. Another may show roads, forests or industrial areas. Planners switch layers on and off to see clashes and gaps.
BISAG-N developed the indigenous geospatial platform. The name means Bhaskaracharya National Institute for Space Applications and Geo-informatics. The platform combines infrastructure data and geographic data for spatial planning.
The platform helps in two ways. It helps identify infrastructure gaps. It also helps compare routes by time and cost.
How big is it? The 13 October 2026 anniversary release reported more than 1,800 data layers. It also reported coverage of 58 Central Ministries and Departments and all 36 States and Union Territories.
Other official papers give different layer totals. An infrastructure factsheet dated 12 August 2026 reported over 3,291 layers. A five-year backgrounder reported over 23,493 layers as of 12 October 2026. These sources do not show one common way of counting. So do not treat the three numbers as one growing series.
The safe habit is simple. Quote a layer count with its date and its source. Never mix totals from different papers. (Source: PIB, five-year review.)
True or False: The Gati Shakti platform was developed by BISAG-N and is a GIS.
5Who reviews a project under PM Gati Shakti?
The approved framework has three institutional levels. They are the Empowered Group of Secretaries (EGoS), the Network Planning Group (NPG) and the Technical Support Unit (TSU).
The Cabinet Secretary chairs the EGoS. This group reviews implementation. It also sets the framework for amendments to the master plan.
The NPG includes the network-planning heads of infrastructure ministries. It examines proposals for unified planning, integration and optimisation. It looks at multimodal links, last-mile connectivity and coordination at the planning stage. A last-mile gap is a short missing link, like a road between a factory and a rail yard.
The TSU has domain and subject experts. It supports the secretariat work of the Logistics Division. That Division sits in the Department for Promotion of Industry and Internal Trade (DPIIT), Ministry of Commerce and Industry.
Think of a school. The principal sets rules, a staff panel checks each plan, and a support office does the paperwork. EGoS, NPG and TSU play those three roles.
The key point is that the NPG evaluates. Evaluation is not the same as sanction. The ministry or state that owns a project still has to approve and fund it. (Source: PIB, parliamentary reply.)
True or False: The Cabinet Secretary chairs the Empowered Group of Secretaries.
6How many projects has the NPG evaluated, and what do the numbers mean?
As of 11 August 2026, the NPG had evaluated 396 projects worth about ₹18.66 lakh crore. Of these, 256 were sanctioned. And 198 were under implementation.
Two months later, the 13 October 2026 review reported 421 evaluated projects worth about ₹20.23 lakh crore. No later official figure replaced this total in the search up to 31 October 2026.
| Date | Projects evaluated | Approximate value |
|---|---|---|
| 11 August 2026 | 396 | ₹18.66 lakh crore |
| 13 October 2026 | 421 | ₹20.23 lakh crore |
Read these figures by stage. A project is first evaluated. It may then be sanctioned. Only later is it under implementation, and later still, complete. Evaluation does not prove construction. Sanction does not prove completion.
Who pays? A Parliament reply published on 5 August 2025 said PM Gati Shakti has no specific or separate fund allocation. It is a planning framework. Each ministry or state funds its own works. One link exists, though. A ₹5,000 crore provision supported states’ PM Gati Shakti infrastructure under the 2022–23 capital-investment assistance scheme.
Always note the date beside a figure. (Source: PIB, infrastructure factsheet.)
True or False: If the NPG has evaluated a project, that project is already built.
7How does PM Gati Shakti link with the National Logistics Policy?
The National Logistics Policy (NLP) was launched on 17 September 2022. It complements PM Gati Shakti. Gati Shakti plans the physical network. The NLP deals with logistics services and the digital systems around them.
One such system is ULIP, the Unified Logistics Interface Platform. It supports logistics data exchange. It acts as a digital integration layer under the NLP.
How costly is logistics in India? The Assessment of Logistics Cost in India report was launched on 20 September 2025. DPIIT developed it with NCAER. It estimated logistics costs at 7.97% of GDP for 2023–24. GDP means gross domestic product, the value of all goods and services made in a year.
Be careful with this number. The report gives an estimate for one year. It does not show that PM Gati Shakti alone caused the result. Many factors shape logistics cost. So never write that Gati Shakti cut the cost to 7.97%.
A simple comparison helps. A student’s marks depend on teachers, books, health and effort. You cannot credit one tuition class for the full result. Logistics cost works the same way.
Keep the pair straight: Gati Shakti is the planning map, and the NLP is the wider policy for services and rules. (Source: PIB, logistics-cost backgrounder.)
True or False: The Assessment of Logistics Cost in India report estimated logistics costs at 7.97% of GDP for 2023–24.
8What are the district and public versions of the platform?
The plan also reaches down to districts. The District Master Plan was launched for 27 aspirational districts on 15 October 2024. An aspirational district is one picked for extra development effort.
What could districts do with it? Potential uses include picking industrial sites and finding gaps in access to medical care. These are potential uses. They are not proof of completed factories or hospitals.
There is also a public version of the platform. As of October 2026, it gave access to 230 approved datasets. Uses include site suitability, connectivity mapping and alignment planning. An alignment is the exact line a road or rail track follows.
Two dates are worth noting, each tied to its own source. The anniversary release dates the Public platform launch to September 2025. The backgrounder dates private-sector opening through query-based analytics to October 2025. The papers do not settle whether these were separate rollout stages. So do not give one date to both events.
A public version does not mean every planning layer is open to everyone. Only approved datasets are offered.
The lesson is to read each claim with its date and source. (Source: PIB, five-year backgrounder.)
Think it through: who gains from open data?
A small firm wants to choose a site for a cold store. Which map layers would it check first? Name two, and say why. This is a teaching exercise, not a reported case.
9What changed in October 2026?
On 6 October 2026, the Union Cabinet approved setting up the Integrated Transport & Logistics Authority (ITLA) as a special purpose vehicle. A special purpose vehicle is a body created for one defined job.
ITLA’s approved roles include research, integrated planning, appraisal, monitoring, impact assessment and data analytics. It is to prepare a National Transport Master Plan with a horizon of ten years or more.
It will also do technical appraisal of Government of India infrastructure projects costing ₹500 crore or more. Note the word technical. Financial appraisal keeps its existing mechanisms. So ITLA does not take over money checks.
The approval alone does not show that staffing is complete or that ITLA is fully working. Treat it as a decision, not a finished body.
Citizens were also invited to help. DPIIT’s Logistics Division and MyGov sought suggestions on the National Transport Master Plan. The consultation ran from 13 October 2026 to 26 October 2026. It asked about connectivity, travel experience and transport priorities for the next ten years.
The Prime Minister also stressed data quality. At the PRAGATI meeting on 24 June 2026, he called for timely updates to project details, utilities, infrastructure layers, clearances and field information.
A map is only as good as its latest update. (Source: PIB, Cabinet decision.)
10Which distinctions do exams test?
Most questions on this topic test a few pairs. Learn each pair as two sides of one line.
Seven engines versus six pillars. Engines are sectors such as roads and ports. Pillars are planning principles such as Synchronisation and Analytical.
Launch versus approval. The plan was launched on 13 October 2021. The CCEA approved it and its framework on 21 October 2021.
Evaluation versus sanction. The NPG evaluates projects. The owner ministry or state sanctions and funds them. Completion is a third, later stage.
Coordinator versus replacement. Gati Shakti coordinates Bharatmala, Sagarmala, UDAN, inland waterways and land ports. It does not replace them.
Planning versus policy. Gati Shakti plans the physical network on a shared map. The National Logistics Policy covers services, rules and digital tools such as ULIP.
Dated figures. Always attach a date. Layer counts of 1,800, 3,291 and 23,493 come from different papers. Project counts of 396 and 421 come from different dates.
Use a simple routine on any new question. First find the pair being tested. Then check which side the option describes. Then watch for words like “replaced”, “sanctioned” or “completed”, which are favourite traps.
Related reading on this site covers the schemes that Gati Shakti coordinates. (See the Related links below.)
MCQ on PM Gati Shakti
Try 8 practice questions on this topic.