India’s standard battle tanks are too heavy for many stretches of its mountain border. That gap is why a new 25-tonne light tank exists. This article covers India’s Army tanks and armoured vehicles — the fleet in service, and what’s replacing it.
Timeline
- 3 September 2024: The Future Ready Combat Vehicle (FRCV) programme receives official approval.
- 2025: The Zorawar light tank completes its development trials.
- Early 2026: Zorawar’s Army user trials begin, starting in Ladakh’s high-altitude terrain.
- Expected 2027: Zorawar’s planned induction into the Indian Army.
Must Know
- India’s Army tank fleet mixes license-built (T-90S Bhishma) and indigenous (Arjun) main battle tanks, plus a new indigenous light tank, Zorawar, in development.
- Zorawar is a 25-tonne class light tank, jointly developed by DRDO and L&T, designed for high-altitude and air-transportable deployment.
- The Future Ready Combat Vehicle (FRCV) programme, approved 3 September 2024, plans to procure 1,770 new tanks in phases, replacing India’s ageing T-72 fleet.
- India operates about 1,300 T-90S Bhishma tanks, built under licence at the Heavy Vehicles Factory, Avadi.
Good to Know
- Zorawar’s development trials are complete. User trials by the Army are set to begin in early 2026, starting in Ladakh’s terrain.
- Zorawar is expected to enter service by 2027.
- FRCV’s first phase covers 590 of the planned 1,770 vehicles, at a cost of about ₹57,000 crore.
- FRCV is unlikely to enter service before the mid-2030s — a much longer runway than Zorawar’s.
Test Yourself
Great to Know
- Zorawar exists because of a specific gap. Standard MBTs like T-90 and Arjun are too heavy for many high-altitude, forward-deployed terrains, especially along the China border. A dedicated light tank fills that gap, rather than replacing the heavier fleet.
- FRCV’s mid-2030s timeline against Zorawar’s 2027 target shows India running two different tank-modernisation clocks at once. One is a fast track for an urgent capability gap. The other is a slow, structured track for wholesale MBT replacement.
- Arjun’s decades-long, still-incomplete rollout is a cautionary case often cited in India’s indigenous defence programmes. It’s part of why FRCV is being run under a “strategic partnership” industry model instead.
- For the organisation behind these programmes, see SciTech0011 — DRDO. For India’s missile defence layer, see SciTech0017 — Ballistic Missile Defence Programme.
Beyond the answer
Browse all science-and-technology topics →
📚 Keep reading
ModHist0101 — The Indian National Army and Netaji: From Command to the Red Fort TrialsPolity0181 — K.M. CariappaSciTech0204 — Blue LEDs: The 2014 Nobel Invention That Lit Up the Modern WorldUPSC CSP 2021 — General Studies Paper I (Full Question Paper)CDS (II) 2016 — General Knowledge (Full Question Paper)❓ Practice this topic
What does India's National Viral Hepatitis Control Programme aim to achieve by 2030?According to WHO, how does viral hepatitis's global death toll compare to HIV/AIDS?What can now cure most Hepatitis C infections, even without a vaccine?Since when has a Hepatitis B vaccine existed?🎲 Take a Science And Technology Quiz
Leave a Reply