At a glance
A 2030 target, and a 2026 reality check
4 Jan 2023
Cabinet approval, ₹19,744 crore initial outlay.
5 MMT/year
2030 target for green hydrogen production capacity.
SIGHT
Strategic Interventions for Green Hydrogen Transition, the core scheme.
~8,000 TPA
Actually commissioned by early 2026, against the 2030 target.
On this page
What Is the Mission?
The mission aims to make India a centre for producing, using, and exporting green hydrogen and its products. MNRE leads it, and the Cabinet approved an initial ₹19,744 crore on 4 January 2023.
- The idea. Imagine a fertiliser plant using hydrogen made from natural gas. It could buy green hydrogen instead, cutting emissions from making that hydrogen.
- The catch. That benefit still depends on clean electricity and sound project design.
- The key concept. Hydrogen is an energy carrier, not an energy source. Electricity makes it, and users later draw energy back out of it.
Hydrogen is a primary source of energy, like coal or sunlight.
What Are the 2030 Targets?
The mission aims for at least 5 million metric tonnes of annual green hydrogen production capacity by 2030.
- Linked renewable capacity. It’s tied to about 125 gigawatts of added renewable-power capacity.
- Emissions projection. The Cabinet also projected about 50 million tonnes of annual greenhouse-gas emissions avoided by 2030.
- Read carefully. These are targets and projections, not measured 2026 output or achieved savings. A plant’s rated yearly capacity can differ from its actual yearly production.
The mission’s 50 MMT emissions-abatement figure is a 2030 projection, not a measured result.
How Does the Funding Work?
The initial ₹19,744 crore outlay has four parts. The largest is SIGHT — Strategic Interventions for Green Hydrogen Transition.
| Allocation | Purpose |
|---|---|
| ₹17,490 crore | Incentives for making electrolysers in India, and producing green hydrogen. |
| ₹1,466 crore | Pilot projects that test new uses. |
| ₹400 crore | Research and development. |
| ₹388 crore | Other mission work. |
- March 2026 status. MNRE reported awards to 18 hydrogen producers and 15 electrolyser manufacturers, covering 862,000 tonnes/year of awarded production capacity.
- Watch this distinction. An award is a project commitment. It does not prove a factory has started operating — check commissioning and actual supply separately.
An MNRE award to a hydrogen producer means that producer has already started supplying hydrogen.
What Makes Hydrogen Green?
Electrolysis itself splits water. But a coal-powered electrolyser can still cause high emissions elsewhere in the grid.
- India’s standard. The 2023 Green Hydrogen Standard limits well-to-gate emissions to 2 kilograms of CO2-equivalent per kilogram of hydrogen.
- 2025 certification. MNRE’s scheme also counts emissions from any non-renewable energy used at the plant.
- Colour labels aren’t proof. Grey hydrogen normally comes from fossil fuels without carbon capture. Blue hydrogen uses fossil fuels with carbon capture. The measured emissions matter more than a colour name alone.
Watch this trap: natural-gas reforming with carbon capture describes blue hydrogen, not green. Green hydrogen specifically means electrolysis powered by renewable electricity.
Hydrogen made from natural gas reforming with carbon capture is classified as green hydrogen.
Where Can Green Hydrogen Help?
Industry already uses hydrogen to make ammonia for fertiliser and to process oil. Replacing fossil-based hydrogen there can cut emissions.
- Hard-to-electrify sectors. Steel, fertiliser, refining, and some shipping are difficult to clean up with batteries alone.
- Fuel forms. Ships may use green ammonia or methanol. A fuel cell turns hydrogen into electricity for vehicles, with water as its exhaust.
- Direct combustion too. Hydrogen can burn in a suitable engine, and some gas systems can carry limited blends after technical checks.
Direct use of clean electricity often wastes less energy. Hydrogen is most useful where direct electrification is genuinely difficult.
A fuel-cell car has no tailpipe emissions. Is it automatically a zero-emission vehicle?
Not automatically. The vehicle itself emits only water. But the hydrogen it runs on still has a production history. If that hydrogen came from a coal-powered electrolyser, or from natural gas without carbon capture, real emissions happened upstream, just not at the tailpipe. Whether the whole chain is genuinely low-emission depends on how the hydrogen was made, not just how the vehicle runs.
2026 Update: Awards vs. Actual Output
2026 brought both a real industrial pilot and a sober reality check on cost and scale.
- A genuine first. Maruti Suzuki commissioned a 300 kW green hydrogen electrolyser pilot at its Manesar plant on 24 September 2026. It blends hydrogen with natural gas as a process fuel, with plans to scale up in Gujarat.
- The price is now visible. SECI’s price discovery on 29 September 2026 fixed green ammonia rates from two suppliers. ACME Cleantech came in at ₹49.75/kg, and Indorama India at ₹64.74/kg, for a combined 724,000 tonnes a year.
- The gap that matters. Independent reporting put actually commissioned capacity at only around 8,000 tonnes/year by early 2026 — a small fraction of the 2030 target. Green hydrogen still costs roughly ₹397–560/kg, against ₹150–200/kg for grey hydrogen.
- Updated award figures. An August 2026 Parliament reply cited 756,100 tonnes/year of awarded production capacity across 16 companies. That’s lower than March 2026’s 862,000 tonnes across 18 companies, most likely from a different reporting scope, not a rollback.
Remember: awarded capacity, commissioned capacity, and actual annual output are three different numbers. An exam question can test any one of them, so read exactly which one is being asked about.
By early 2026, actually commissioned green hydrogen capacity was far smaller than the 2030 target of 5 million tonnes/year.
Previous Year Questions
- UPSC CSE Prelims 2023. Tested three uses of green hydrogen: as direct combustion fuel, blended with natural gas, and in a fuel cell. All three statements were correct. View the full question →
- CAPF (ACs) 2025. Paired two claims: 2023 Cabinet approval (correct), and the Environment Ministry running certification (wrong — MNRE runs it). View the full question →
- A common trap. A statement mixing “natural gas reforming with carbon capture” (blue hydrogen) into a green-hydrogen question is a frequent way exams test the colour distinction.
The Ministry of Environment, Forest and Climate Change runs India’s Green Hydrogen Certification Scheme.
Quick Q&A
If commissioned capacity is only ~8,000 tonnes/year, does that mean the mission has failed?
Not necessarily. A mission built around 2030 targets is meant to ramp up over years, and 2026 awards (756,100–862,000 TPA) show the pipeline is filling. But it’s fair to note the gap between what’s been awarded and what’s actually running, and to watch whether commissioning catches up before 2030.
Why did the March and August 2026 award figures differ?
The August figure (756,100 TPA, 16 companies) is lower than March’s (862,000 TPA, 18 companies). This most likely reflects different scopes or reporting windows, not withdrawn awards. Always check the reporting date and scope before comparing two official figures.
Related: see Solar Energy in India and PM Surya Ghar: Muft Bijli Yojana for the renewable-power side of this mission.
MCQ on the National Green Hydrogen Mission
Try 6 practice questions on SIGHT, targets, colour labels, and past PYQs.
Question 1 of 1 Question 1 of 1 Question 1 of 1 Question 1 of 1 Question 1 of 1 Question 1 of 1
🎲 More Environment and Ecology Practice
Leave a Reply