Green hydrogen is hydrogen made with clean power under a fixed emissions limit. India’s National Green Hydrogen Mission wants to build this industry by 2030. This lesson covers the rules, the money, the targets and the October 2026 updates.
A schematic diagram of a hydrogen fuel cell
A schematic diagram of a hydrogen fuel cell.

At a glance

Four facts to fix in your head

01

4 January 2023

Cabinet approved the Mission, with ₹19,744 crore initial outlay.

02

5 million tonnes

Annual capacity target for 2030, not today’s output.

03

2 kg CO₂e per kg

The emissions ceiling for green hydrogen.

04

SIGHT

The main scheme, with ₹17,490 crore.

ElectrolyserA machine that uses electricity to split water into hydrogen and oxygen.
Well-to-gateEmissions counted from the start of production to the plant gate.
SIGHTStrategic Interventions for Green Hydrogen Transition.
OfftakeA buyer’s signed promise to take a supply.
More to read

1What makes hydrogen “green”?

Hydrogen is called green when it is made with clean power and stays under a set emissions limit. The method most people know is electrolysis. In electrolysis, electricity splits water into hydrogen and oxygen. If the electricity is renewable, the process can be a low-emission source of hydrogen. The power source decides much of the result. (Source: US Department of Energy.)

India’s rule is a number. Green hydrogen must stay within a well-to-gate ceiling of 2 kg CO₂ equivalent per kg of hydrogen. Well-to-gate means emissions counted from the start of production to the plant gate. The figure is averaged over 12 months. (Source: PIB, 19 August 2023.)

The counted steps include water treatment, electrolysis, gas purification, drying and compression. Think of a bakery that counts the flour, the oven and the packing. All of those add up to the final carbon cost.

Here is a common mistake. Many learners think “green” means zero emissions at every step. It does not. The standard allows emissions inside the ceiling.

A second mistake is to think only electrolysis counts. India’s definition covers electrolysis-based and biomass-based production. Both routes must meet the same limit.

True or False: India recognises only electrolysis-based green hydrogen.

2Why does India need a hydrogen transition?

India needs it because heavy industry already uses a lot of hydrogen. Today most of that hydrogen is made from fossil fuels. Refineries, fertiliser plants and chemical industries have traditionally used it this way. (Source: MNRE model policy guidelines.)

Replacing fossil-based hydrogen with green hydrogen can reduce industrial emissions. The plant keeps making the same product. Only the source of the hydrogen changes.

That is why the Mission starts with industry. A big plant buys hydrogen in large steady amounts. Steady buyers give new producers a market they can count on.

Take a fertiliser plant as the familiar case. Hydrogen is a raw material for ammonia. Ammonia is then used to make fertilisers. So hydrogen policy and fertiliser production are directly linked. Green hydrogen can also replace fossil-based inputs in petroleum refining.

The Mission also supports use in steel, heavy-duty transport and shipping. (Source: PIB, 28 October 2026.)

A likely misconception is that green hydrogen is a new demand. In fact, the demand already exists. The change is in how the hydrogen is made.

3When did the Mission begin, and who runs it?

The idea came before the Mission. The National Hydrogen Mission was announced on 15 August 2021. On 17 February 2022, the Ministry of Power notified the Green Hydrogen/Green Ammonia Policy. (Source: PIB, 17 February 2022.)

The Union Cabinet approved the National Green Hydrogen Mission on 4 January 2023. Its aim is to make India a global hub for producing, using and exporting green hydrogen and its derivatives. A derivative is a product made from hydrogen, such as green ammonia. (Source: Cabinet approval, PIB.)

The Ministry of New and Renewable Energy (MNRE) coordinates and implements the Mission. A Mission Secretariat sits inside MNRE. It coordinates the programme work. (Source: Mission framework.)

Exams love to mix up these dates. A simple trick helps. Announced in 2021, policy in 2022, Cabinet approval in 2023.

Another trap is the ministry. The Ministry of Power issued the 2022 policy. MNRE runs the Mission itself.

Remember: 15 August 2021 announced, 17 February 2022 policy, 4 January 2023 Cabinet approval.

4How much public money was approved?

The approved initial outlay is ₹19,744 crore. It runs up to 2029–30. This is public money from the government. (Source: PIB.)

The money is split into four parts. The biggest part goes to SIGHT. Think of it as a family budget. Most of it goes to one big need, and small amounts go to the rest.

ComponentApproved allocation
SIGHT programme₹17,490 crore
Pilot projects₹1,466 crore
Research and development₹400 crore
Other Mission components₹388 crore

Add the four rows and you get ₹19,744 crore. (Source: Cabinet approval, PIB.)

Now the misconception. Learners often see “₹8 lakh crore” in news about the Mission. That is not the government’s outlay. It is the investment the Mission expects to bring in. The next section explains it.

One more way to remember: outlay is what the government spends. Investment is what everyone together is expected to spend. Public money is meant to pull in that larger private sum.

True or False: ₹8 lakh crore is the Mission’s approved government outlay.

5What does the Mission expect by 2030?

The Mission sets goals for 2030. Remember one point first. These are intended outcomes. They are not results already achieved. (Source: Cabinet approval, PIB.)

IndicatorTarget or expected outcome
Annual green hydrogen production capacityAt least 5 million metric tonnes
Associated renewable energy capacity addedAbout 125 GW
Total investmentOver ₹8 lakh crore
EmploymentOver 6 lakh full-time jobs
Cumulative fossil-fuel import reductionOver ₹1 lakh crore
Annual emissions avoidedNearly 50 million metric tonnes of greenhouse gases

Sources: MNRE annual report 2024–25; PIB document.

Why the 125 GW? Electrolysers need a lot of renewable power. So the hydrogen target comes with a renewable power target.

A student might read “5 million tonnes” as today’s output. It is a 2030 capacity goal. Always ask whether a number is a target, an award or real output.

Think it through: which project would you support first?

Two projects ask for the same subsidy. One replaces fossil-based hydrogen in a fertiliser plant. The other stores electricity for later use. Ask for evidence on cost, emissions, water use and other options. The answer depends on that evidence, not on which project sounds newer.

6What does SIGHT support, and what are the two phases?

SIGHT means Strategic Interventions for Green Hydrogen Transition. It gives financial incentives for two things. One is making electrolysers in India. The other is producing green hydrogen. (Source: PIB, 28 October 2026.)

An electrolyser is the machine that splits water using electricity. So electrolyser manufacturing capacity measures how many machines are built. It does not measure hydrogen output. Think of a car factory. Its capacity tells you how many cars it can build, not how many people are driving.

The Mission runs in two phases. Phase I covers 2022–23 to 2025–26. It focuses on creating demand, building domestic electrolyser manufacturing and developing the supporting ecosystem. (Source: MNRE Mission overview.)

Phase II covers 2026–27 to 2029–30. It envisages wider deployment. It also allows possible commercial projects in steel, mobility and shipping.

That growth depends on costs and market demand. The document treats cost competitiveness as an expectation. It is not a guarantee.

7Why does India build hydrogen hubs?

A hydrogen hub is a cluster. Production, storage, transport and users sit together in one region. (Source: PIB, 10 October 2025.)

The cluster approach tries to ease transport problems. It also aims to make projects more viable. Compare it with an industrial estate. When the supplier, the factory and the customer are close, costs fall and delays shrink.

On 10 October 2025, the government announced recognition of three port hubs. They are Deendayal in Gujarat, V.O. Chidambaranar in Tamil Nadu and Paradip in Odisha.

Here is a point students miss. Recognition as a hub under Component B2 does not give direct financial assistance. Projects there can still seek benefits under other schemes that apply.

So a recognised hub is a label for planning, not a cheque. Read the wording of any exam statement about “funding for hubs” with care.

Why ports? Ports handle exports and shipping, and the Mission names shipping as a use. A port hub puts the producer near the buyer. The Mission also hopes to export green hydrogen and its derivatives.

8What could slow green hydrogen down?

Green hydrogen faces real limits. Knowing them helps you judge claims in the news. (Source: IEA Breakthrough Agenda Report 2025.)

Cost comes first. In the IEA’s 2025 assessment, renewable and low-carbon hydrogen was still more expensive than hydrogen from unabated fossil fuels. Unabated means no carbon capture. Electrolyser costs can fall with manufacturing scale, innovation and deployment. That fall is not automatic.

Water and the environment come next. Electrolysis projects must look at water use, energy efficiency and environmental impact. (Source: UK Environment Agency guidance. It supports the technical idea, not Indian permit rules.)

Energy loss comes last. Turning electricity into hydrogen and back into electricity wastes some energy. Conventional hydrogen storage can be less efficient than lithium-ion batteries for storing electricity. (Source: California Energy Commission.)

So hydrogen is not the best answer to every problem. It makes most sense where the alternatives are weak.

Think it through: what would prove progress beyond a contract?

Design a tracker with separate columns for announcements, signed contracts, financing, construction, commissioning and verified production. Only the last column should be compared with an annual production target. The earlier columns show intent, not output.

9How is the green label verified?

A label needs proof. India built a system for it. MNRE notified the Green Hydrogen Standard on 18 August 2023. It is the rulebook that sets the emissions ceiling. (Source: PIB.)

The Bureau of Energy Efficiency (BEE) is the nodal authority. It accredits the agencies that monitor, verify and certify green hydrogen projects. Think of it as the body that licenses the examiners.

The Green Hydrogen Certification Scheme of India was published in April 2025. It covers monitoring, verification, certification and chain-of-custody tracking. Chain of custody means following the hydrogen from the plant to the buyer. (Source: Rajya Sabha answer, 22 July 2025.)

In June 2026, a dedicated certification portal went live. It supports certification and compliance. (Source: PIB, 28 October 2026.)

The common error is to expect perfection. The standard does not ask for zero emissions. It asks for emissions within the 2 kg ceiling.

True or False: India’s green hydrogen standard requires absolutely zero production emissions.

10What changed in early 2026?

The first months of 2026 added new standards and award figures. Keep the dates and the products apart.

On 27 February 2026, India notified standards for green ammonia and green methanol. The green ammonia ceiling is 0.38 kg CO₂ equivalent per kg of ammonia. It is averaged over the preceding 12 months. It applies to specified non-biogenic emissions across production and processing. (Source: PIB, 7 March 2026.)

A release reported on 24 March 2026 gave award figures. (Source: PIB.)

  • Electrolyser manufacturing awards covered 3,000 MW per year across 15 companies.
  • Green hydrogen production awards covered 8,62,000 tonnes per year across 18 companies.
  • SECI had discovered prices for 7,24,000 tonnes per year of green ammonia for 13 fertiliser units.

These are awarded capacities. They are not produced tonnes. Price discovery means buyers and sellers found a price. It is not the same as a signed supply agreement or finished production.

The same release uses two units. Megawatts measure electrolyser machines. Tonnes measure hydrogen or ammonia. Never swap them.

11What happened in September and October 2026?

Late 2026 moved from awards towards contracts. Still, none of it proves actual production.

On 24 September 2026, SECI published a second-tranche tender for 54,000 tonnes per year of green ammonia. Amendment-01 and Clarification-01 were uploaded on 28 October 2026. As of October 2026, this was a buying process. It did not show commissioned production. (Source: SECI tender record.)

On 29 October 2026, the government reported two sets of numbers. (Source: PIB.)

  • Firm signed offtake commitments reached 5,55,610 tonnes per year in green hydrogen equivalent. This covered 23 contracts, with over 70% earmarked for exports.
  • SIGHT agreements covered 6,70,000 tonnes per year of green ammonia for 11 fertiliser units. Refinery projects awarded covered 30,000 tonnes per year of green hydrogen.

An offtake commitment is a buyer’s promise to take supply. It is a promise to buy, not measured output.

The products differ too. Ammonia tonnes and hydrogen-equivalent tonnes cannot be added without conversion. Also, the March and October updates mix different products and stages, so compare them with care.

A follow-up search covered 30–31 October 2026. It found no later substantive Mission update in the checked PIB listings. That is a search finding, not proof that none exists.

True or False: The October offtake figure proves that India already produced 5,55,610 tonnes of green hydrogen a year.

True or False: Green ammonia tonnage and green hydrogen tonnage can be added without conversion.

12What do earlier exam questions test?

Two earlier papers carried this topic. Both link to the full paper on this site.

Keep four checks in mind. Green hydrogen is judged by emissions, not by a colour name. The Cabinet approved the Mission on 4 January 2023. MNRE leads it. Targets, awards, contracts and output are four different numbers.

Check your understanding. These checks are for this page only and do not save to My Progress.0 / 0 answered correctly  

MCQ on the National Green Hydrogen Mission

Try 6 practice questions on this topic.

Which of the following statements with regard to Green Hydrogen is/are correct?
1. It is decarbonized hydrogen obtained from natural gas reforming combined with carbon capture and storage (CCS).
2. It is produced using electrolysis of water with electricity generated by renewable energy.
3. National Green Hydrogen Mission of India aims for abatement of nearly 50 MMT of annual greenhouse gas emissions by 2030.

Select the correct answer using the code given below.

With reference to green hydrogen, consider the following statements:

1. It can be used directly as a fuel for internal combustion.

2. It can be blended with natural gas and used as fuel for heat or power generation.

3. It can be used in the hydrogen fuel cell to run vehicles.

How many of the above statements are correct? [UPSC CSP 2023]

Which of the statements given below is/are correct?
1. The National Green Hydrogen Mission (NGHM) was approved by the Union Cabinet, Government of India, in the year 2023.
2. The Ministry of Environment, Forest and Climate Change, Government of India, has launched the Green Hydrogen Certification Scheme of India. [CAPF (ACs) 2025]

What does SIGHT stand for, under the National Green Hydrogen Mission?

Consider these two statements about the National Green Hydrogen Mission’s targets.

Statement 1: it targets 5 million metric tonnes of green hydrogen production capacity a year by 2030.

Statement 2: it targets roughly 125 GW of added renewable energy capacity to support that production.

Which statement(s) is/are correct?

As detailed on 29 July 2026, the National Green Hydrogen Mission’s 12 transport pilot projects fund how many hydrogen-powered vehicles?
Was this helpful?

Beyond the answer

    Share your thoughts

    ✨Study Helper
    ✨ Study Helper AI×

    MCQ Question is an independent study site, not affiliated with any government body or exam authority. Official sources: UPSC upsc.gov.in · SSC ssc.gov.in · NCERT ncert.nic.in · PIB pib.gov.in

    WhatsApp support: +91 9319788829