Solar Energy in India

Solar energy is energy from sunlight. Solar panels turn it into electricity. Solar collectors turn it into heat. India had 2.8 GW of installed solar power in 2014. It reached 164.59 GW on 31 July 2026. That is installed capacity, not electricity produced each year. This lesson explains how solar works, how India builds it, and how to read the records that exams love.
Satellite view of the Bhadla Solar Park photovoltaic cluster, Rajasthan, India
Bhadla Solar Park, Rajasthan, seen in Copernicus Sentinel-2 satellite imagery in 2020. Image: Solargis, via Wikimedia Commons.

At a Glance

Four facts to hold on to.

01

Capacity

164.59 GW on 31 July 2026.

02

2014

About 2.8 GW.

03

Target

500 GW non-fossil capacity by 2030.

04

Rooftop

PM Surya Ghar: one crore households by 2027.

Photovoltaic effectLight releases electric charges in a semiconductor, making DC power.
InverterChanges DC into AC for appliances.
Net meteringA two-way meter recording power sent to and drawn from the grid.
ALMMApproved List of Models and Manufacturers.

Chapter 1: How Solar Works

Must Know

Sunlight to power

  • Solar radiation is energy carried by sunlight. It reaches Earth as light and heat.
  • In a photovoltaic (PV) cell, light releases electric charges in a semiconductor. Their movement creates direct-current (DC) electricity.
  • Solar thermal equipment captures sunlight as heat. It can warm water or air.
  • Concentrated solar power uses mirrors, heat, steam and a turbine. It can use stored heat to make electricity later.
  • PV makes electricity directly. Solar thermal mainly makes heat.

Main parts of a PV system

  • Modules, mounting, cables, safety devices and an inverter.
  • The inverter changes DC into AC for common appliances.
  • A grid-connected system works with the local network. It can draw grid power when panels produce too little. A battery is optional.
  • An off-grid system works without a utility connection. Batteries store power for later. It needs careful sizing and battery replacement planning.

Capacity versus generation

  • Capacity is the maximum rated power at a moment, in MW or GW.
  • Generation is electricity produced over time, in kilowatt-hours.
  • The 164.59 GW figure is capacity.
Remember: PV = electricity. Thermal = heat. Capacity is not generation.

True or False: India’s 164.59 GW figure shows how much solar electricity it generated in a year.

Chapter 2: Types, Geography and the Supply Chain

Good to Know

Kinds of solar

  • Utility solar: large ground-mounted plants send power to the grid. Solar parks share roads, substations, water lines and clearances.
  • Rooftop solar: homes, schools, shops and factories place panels on roofs. Net metering records power sent to and drawn from the grid. State rules set the bill treatment.
  • Agricultural solar: PM-KUSUM supports solar pumps and small grid-connected plants. Pumps can reduce diesel use, but easy pumping can also raise groundwater pressure.
  • Floating solar: panels on rafts over reservoirs. It limits land pressure. Anchoring, cables, water use and ecology still need review.

Where does solar work in India?

  • Most Indian regions get strong sunshine.
  • Rajasthan and Gujarat have large open sites.
  • MNRE’s 2025 map shows potential in other states too, such as Karnataka, Andhra Pradesh and Maharashtra.
  • Cloud, dust, slope and grid access affect each site.
  • Read more: Karnataka, Andhra Pradesh and Maharashtra.
  • (Source: MNRE 2025 resource map.)

Who runs it?

  • The Ministry of New and Renewable Energy (MNRE) leads central solar programmes.
  • The Solar Energy Corporation of India (SECI) runs tenders.
  • Regulators set rules. Distribution companies connect many projects.
  • Read more: National Solar Mission.
  • (Source: MNRE solar programmes.)

Household and farm policy

  • PM Surya Ghar: Muft Bijli Yojana supports rooftop systems. Its target is one crore households by 2027.
  • PM-KUSUM supports solar pumps and decentralised plants. MNRE lists a 34.8 GW target through March 2026.
  • A target is not the same as completed capacity.
  • Read more: PM Surya Ghar: Muft Bijli Yojana.

Making a panel

  • The chain runs from quartz and polysilicon to ingots, wafers, cells, modules, glass, frames, inverters and installation.
  • India has grown module assembly faster than some upstream stages.
  • In August 2025, MNRE reported 100 GW of module capacity on the ALMM list. That is listed factory capacity, not yearly output.
  • The PLI scheme supports high-efficiency modules. ALMM sets eligibility for many government-supported projects.
  • Policies change, so check current orders.
  • (Sources: MNRE PLI scheme; MNRE ALMM list.)

True or False: A target is not the same as completed capacity.

Chapter 3: Benefits, Costs and Limits

Good to Know

Benefits

  • Solar needs no fuel while it operates.
  • Rooftop systems can cut daytime grid purchases.
  • Solar plants diversify India’s electricity supply.

Costs and limits

  • Costs: land or roof space, panels, inverters, wiring, finance and maintenance. Batteries add cost.
  • Auction tariffs are bids, not every consumer’s bill. A low price does not show the full system cost.
  • Land and water: ground plants compete with other land uses. Poor siting can disturb habitats or livelihoods. Cleaning panels can use water in dusty places.
  • Transmission: sunny areas can be far from demand. New lines and substations are needed. Congestion can delay connections.
  • Intermittency: output changes with daylight, clouds, seasons and dust. It falls after sunset.
  • Storage: batteries shift daytime power to later hours. Pumped storage moves water uphill when power is available, then releases it through turbines.
  • Recycling: panels last decades, then become waste. India’s E-Waste Management Rules, 2022 include solar PV modules, panels and cells.
  • Solar has no smoke at the panel, but mining, manufacturing, land use, transmission and disposal still have impacts.

Net metering

  • A two-way meter records electricity imported from and exported to the grid.
  • It does not mean the grid stores household electricity.
  • Billing rules vary by state.

Example

True or False: Net metering means the grid stores a household’s surplus electricity.

Think it through: Think it through: why does a low solar auction tariff not mean cheap power for every consumer?

The bid covers only the plant’s own power. Transmission, storage, financing and distribution costs come on top. Tariffs also depend on location and the year of the contract.

Chapter 4: Solar Records, Read Carefully

Great to Know

What a record is

  • A solar record is a dated claim tied to a defined measure, place and project stage.

Why only Kerala was correct in 2022

Solar power plant at Cochin International Airport
Solar plant at Cochin International Airport. Photo: Ranjithsiji, CC BY-SA 4.0.
  • Cochin International Airport announced full solar operation in 2015.
  • It became the world’s first airport powered fully by solar energy.
  • The airport is in Kerala. That made statement 2 correct in the UPSC question.
  • “Fully solar powered” describes energy supply over time. It does not mean aircraft run on solar power.
  • The project expanded after its first commissioning, so capacity figures need dates.

The park and floating-solar traps

  • In 2022, Bhadla in Rajasthan held the widely cited largest-solar-park title. Gujarat was wrong in statement 1.
  • Goa did not host India’s largest floating solar project. Statement 3 was wrong.
  • Floating projects can be compared by installed, commissioned or announced capacity. These are not interchangeable.
  • A hybrid park combining solar and wind should not automatically inherit a solar-only title.

How to verify a changing record

  • Ask what is measured: land area, solar capacity, total renewable capacity or yearly generation.
  • Check whether it is planned, under construction, commissioned or operating. Compare only like stages.
  • Check the reference date. Rankings change as new phases connect.
  • Use MNRE, project owners or official agencies. Headlines drop qualifications.

True or False: UPSC CSP 2022 accepted only statement 2, about Kerala’s fully solar-powered airport.

True or False: A solar record stays permanent after publication.

Chapter 5: Real Questions

Exam Angle

Past questions

  • UPSC CSP 2022: statements on Gujarat, Kerala and Goa. Answer (b), 2 only. See the question.
  • UPSC CSP 2016: “net metering” means promoting solar production and use by households and consumers directly, letting them sell surplus power to the grid. See the question.
  • UPSC CSP 2018: India is not among the top makers of silicon wafers for PV units. Tariffs are set through competitive bidding, not fixed directly by SECI. See the question.
  • UPSC CSP 2020: solar power can run submersible pumps, and piston pumps as well as centrifugal ones. Answer (d), neither 1 nor 2 (both limiting statements are false). See the question.
  • UPSC CSP 2025: PM Surya Ghar: the one-crore-household target, MNRE’s training role and the 3-lakh-plus skilled-manpower goal. All three were genuine. Answer (d). See the question.
  • CDS I 2020: the Gandhi Solar Park is on the roof of UN Headquarters in New York, a gift from India for Gandhi’s 150th birth anniversary. Thimphu is a tempting but wrong guess. Answer (a). See the question.
Remember: Exam pattern: watch for “solar can’t do X” traps, and who really sets tariffs.

True or False: Solar power can run only surface centrifugal pumps, not submersible or piston pumps.

Chapter 6: In the News, 2026

Current Affairs

Dated figures

  • 31 July 2026: India reported 164.59 GW of installed solar capacity. This is dated capacity, not yearly generation. (PIB)
  • National target: 500 GW of non-fossil electricity capacity by 2030. It includes more than solar. (PIB, 9 Aug 2026)
  • PM Surya Ghar: a 2024 rooftop scheme aiming at one crore households. A 12 August 2026 update reported 51.58 lakh households benefiting. (PIB factsheet)
  • PM Surya Sarovar, 31 July 2026: the Cabinet approved ₹5,070 crore for 5,000 MW of floating solar paired with storage, through FY 2030-31. (PIB)
  • Manufacturing, 13 August 2025: MNRE reported 100 GW of module capacity under ALMM. Listed capacity does not equal factory output. (PIB)

Timeline

  • 2010: National Solar Mission launched.
  • 2014: about 2.8 GW.
  • 2015: India and France co-founded the International Solar Alliance at COP21.
  • 2017: Solar Parks Scheme target raised from 20 GW to 40 GW.
  • 2021: India and the UK launched the Green Grids Initiative at COP26.
  • Read more: Global Energy Fora: IRENA, IPEEC and Others.

True or False: The Cabinet approved ₹5,070 crore for 5,000 MW of floating solar with storage (PM Surya Sarovar) on 31 July 2026.

Quick Q&A

Capacity 31 Jul 2026?

164.59 GW.

2014 capacity?

About 2.8 GW.

Solar Mission year?

2010.

Largest park (2022)?

Bhadla, Rajasthan.

Surya Ghar target?

One crore households.

0 / 7 correct

🎲 Practice: Solar Energy

7 verified questions from this topic.

Question 1 of 1

How many households does PM Surya Ghar: Muft Bijli Yojana aim to cover with rooftop solar panels?

Question 1 of 1

What is the maximum central subsidy available under PM Surya Ghar, for a rooftop solar system of 3 kW or more?

Question 1 of 1

The Union Cabinet approved PM Surya Ghar: Muft Bijli Yojana on 29 February 2024. What was its total outlay?

Question 1 of 1

Which of the following is a genuine feature of PM Surya Ghar: Muft Bijli Yojana?

Question 1 of 1

In which year was India’s National Solar Mission launched?

Question 1 of 1

The National Solar Mission is one of eight core missions under which national framework?

Question 1 of 1

India’s EV share of vehicle sales grew from about 0.08% in FY 2015-16 to what figure in FY 2025-26?
🎲 More Indian Economy Practice
Was this helpful?

Beyond the answer

    Leave a Reply

    [privacy-do-not-sell-link]

    Discover more from MCQ Questions

    Subscribe now to keep reading and get access to the full archive.

    Continue reading

    ✨Ask doubt
    ✨ Ask a Question AI×
    [privacy-do-not-sell-link]