Menu

Electric Vehicles in India

A decade ago, electric vehicles were 0.08% of India’s car sales. Today they are over 8%. This article covers India’s EV ecosystem: its growth, its schemes and its manufacturing push.

At a Glance

Four facts to hold on to.

01

8.26%

EV share of vehicle sales, FY 2025-26.

02

46x

Growth in unit sales since 2016.

03

₹10,900 crore

Outlay of PM E-DRIVE.

04

52,718

Public charging stations, July 2026.

PM E-DRIVE2024 scheme to support EV sales and charging.
SPMEPCIScheme to make EV passenger cars in India.
IEMIIndia Electric Mobility Index by NITI Aayog.
ACCAdvanced Chemistry Cell batteries.

Chapter 1: Growth and Targets

Must Know

A decade of EV policy

  • India’s EV push began in 2015, with the National Electric Mobility Mission Plan (NEMMP) 2020 and the FAME India scheme.
  • FAME India Phase I ended in March 2019.
  • Phase II ended in April 2024, after ₹11,500 crore in support, 16.72 lakh EVs sold and 5,197 e-buses deployed.
  • In 2024, PM E-DRIVE and SPMEPCI both launched. One supports sales, the other domestic manufacturing.

The 46x growth story

  • EV share of sales grew from about 0.08% in FY 2015-16 to 8.26% in FY 2025-26.
  • Unit sales grew roughly 46 times since 2016, from about 50,000 to 2.3 million in 2025.
  • The world grew roughly 20-fold over the same period.
  • Growth came mostly from two-wheelers and three-wheelers, not passenger cars.

The 2030 target

  • India’s stated target is 30% of vehicle sales electric by 2030.
  • It is aligned with the 2070 net-zero commitment.
Remember: 0.08% to 8.26%. About 46x since 2016. Target: 30% by 2030.

True or False: EV growth in India has come mostly from two-wheelers and three-wheelers.

Chapter 2: Exports, States and Charging

Good to Know

Exports

  • EV exports rose from $1.2 million in 2020 to $84 million in 2024.
  • Nepal, Indonesia and Japan are the main destinations.

Leading States in 2025

Charging infrastructure

  • As of July 2026, India had 52,718 public charging stations.
  • Of these, 16,561 have fast-charging capability.
  • The government’s e-Amrit tool helps drivers find them.

Why DC fast charging is fast

  • Most fast chargers use DC. They convert power at the station and feed it straight into the battery.
  • That skips the car’s slower onboard converter and cuts an 80% charge to 20–40 minutes.
  • Ordinary AC chargers, like those at home, use the onboard converter.
  • A full charge this way can take up to 12 hours.
  • So AC suits overnight home charging, not a highway stop.

The Electric Mobility Index

  • NITI Aayog launched the India Electric Mobility Index (IEMI) in August 2025.
  • It scores States on 16 indicators across transport electrification, charging infrastructure and EV research.
  • Delhi, Maharashtra and Chandigarh are the top “Frontrunner” States. See Chandigarh: The City Beautiful.

Manufacturing and startups

  • Suzuki’s e VITARA launched in August 2025 at its Gujarat plant. It is India’s first Made-in-India global Battery EV, and it exports to over 100 countries. See Gujarat: India’s Longest Coastline and Its Industrial Rise.
  • India has roughly 400 EV startups.
  • The sector raised over $1.4 billion in FY 2025, about 27% more than in 2024.
  • Delhi is the top city for EV investment.

True or False: Ordinary AC home chargers are faster than DC fast chargers.

Chapter 3: Schemes and Technology

Great to Know

PM E-DRIVE

  • It has a ₹10,900 crore outlay, launched in 2024 under the Ministry of Heavy Industries.
  • It targets over 28 lakh EVs.
  • It includes ₹4,391 crore for 14,028 e-buses across nine major cities.
  • It includes ₹2,000 crore for public charging stations.
  • It includes ₹780 crore to modernise testing agencies.

Other schemes

  • PM e-Bus Sewa-PSM (2024) supports 10,000 e-buses through a public-private partnership.
  • SPMEPCI (2024) needs EV car makers to invest at least ₹4,150 crore.
  • It also needs them to raise Domestic Value Addition from 25% to 50% by year five.
  • PLI-Auto (2021) has a full outlay of ₹25,938 crore, against a ₹42,500 crore investment target by March 2027.
  • PLI-ACC (2021) has ₹18,100 crore and targets 50 GWh of cumulative battery capacity. Its performance phase runs 2025 to 2029.

Why batteries matter

  • Batteries make up 35–40% of an EV’s cost, the single largest part.
  • So domestic ACC manufacturing matters for cutting vehicle prices.

LFP versus NMC

  • NMC cells pack more energy per kilogram, so they give longer range for the same weight.
  • LFP cells hold less energy per kilogram, but cost roughly 30–40% less.
  • LFP is also more heat-tolerant and needs no cobalt, an expensive and hard-to-source metal.
  • So LFP is the default for most Indian EVs, given India’s climate and price-sensitive market.
  • NMC still leads in premium models, where range and lower weight justify the cost.

State policies and fuel norms

  • As of December 2025, 29 States and Union Territories had notified their own EV policies.
  • These offer capital subsidies of 15–25%, SGST reimbursement of up to 100% and a concessional 5% GST rate.
  • CAFE III (2027–2032) targets 91.7 g CO2/km. CAFE IV (2033–2037) targets 70 g CO2/km.
  • Meeting these fleet averages gets harder with petrol and diesel lineups alone.

Part of a wider push

Exam Edge

Previous Year Questions

Examiners like battery chemistry, not just sales numbers.

  • UPSC CSP 2025, Q43Four elements were listed: cobalt, graphite, lithium and nickel. How many usually make up EV battery cathodes? Only three. Lithium, cobalt and nickel go into the cathode, as in NMC and NCA chemistries. Graphite is the standard anode material. NMC is the same cathode chemistry discussed above. Answer: (c). View the question.

Chapter 4: Current Affairs

Great to Know

PM E-DRIVE scale

  • As of 22 July 2026, PM E-DRIVE had supported 26.54 lakh EVs, against its 28 lakh target. That included 23.79 lakh electric two-wheelers and 2.68 lakh electric three-wheelers. (Source: PIB)
  • Maharashtra led with 4.28 lakh EVs supported, then Uttar Pradesh (2.78 lakh) and Karnataka (2.67 lakh).
  • ₹689 crore was separately approved for 6,562 new chargers, across 3 oil companies and 9 States. (Source: ANI, PIB)

E-buses: sanctioned versus deployed

  • As of 4 August 2026, PM e-Bus Sewa-PSM covered 27,555 of a targeted 38,000 e-buses, across MoHUA, PM E-DRIVE and State schemes. (Source: PIB)
  • Only 523 e-buses were actually deployed as of 10 July 2026, well behind the sanctioned count.
  • Odisha’s 400 allocated e-buses had zero deployment as of early August. That is a real gap between approval and delivery.

PLI-Auto and rare earth magnets

  • PLI-Auto’s cumulative disbursement reached about ₹2,386 crore, against its ₹25,938 crore outlay. (Source: PIB)
  • On 21 July 2026, the Cabinet’s ₹7,280 crore Rare Earth Permanent Magnet scheme was detailed in the Lok Sabha. (Source: PIB)
  • India imports all its sintered NdFeB magnets, despite finding 767 million tonnes of rare earth ore since 2015.
  • EVs are projected to need 3,250 MTPA of rare earth magnets by 2030, the largest single use. Wind turbines follow at 1,800 MTPA.
  • That import dependence is a real bottleneck for EV manufacturing.

Incentives and a security flag

  • GST on EVs and chargers stands at 5%.
  • EVs also get green licence plates, and the Road Transport Ministry has advised States to waive road tax on EVs.
  • CERT-In flagged a Bluetooth weakness in the Battery Management Systems of low-cost e-rickshaws. Default or missing credentials let outsiders power off moving vehicles remotely. The Ministry of Heavy Industries has advised SIAM and ACMA. (Source: PIB)
  • Delhi launched a ₹9,585 crore scrappage-linked EV scheme in June 2026. It aims to replace about 2.07 lakh old commercial vehicles across Delhi-NCR. (Source: Business Standard)
Think it through: Why do AC and DC chargers differ so much in speed?

The car must turn AC into DC to fill a battery. A DC charger does this outside the car, with more power. An AC charger leaves the slow converter inside the car to do it.

Quick Q&A

EV share in FY 2025-26?

8.26%.

2030 target?

30% of sales.

PM E-DRIVE outlay?

₹10,900 crore.

Which cathode metals?

Lithium, cobalt, nickel.

Anode material?

Graphite.

0 / 2 correct

🎲 Practice: Electric Vehicles in India

8 verified questions from this topic.

Question 1 of 1

India’s EV share of vehicle sales grew from about 0.08% in FY 2015-16 to what figure in FY 2025-26?

Question 1 of 1

Which state topped NITI Aayog’s India Electric Mobility Index (IEMI) as the leading ‘Frontrunner’ in 2025?

Question 1 of 1

What is PM E-DRIVE’s total outlay, and how many EVs had it supported as of July 2026?

Question 1 of 1

The REPM scheme aims to build how much integrated rare earth permanent magnet manufacturing capacity in India, covering the full chain from NdPr oxide to finished magnets?

Question 1 of 1

In the context of electric vehicle batteries, consider the following elements:

1. Cobalt

2. Graphite

3. Lithium

4. Nickel How many of the above usually make up battery cathodes? [UPSC CSP 2025]

Question 1 of 1

What GST rate currently applies to electric vehicles and their chargers/charging stations in India?

Question 1 of 1

Which property of rare earth elements makes them essential in the permanent magnets used in electric vehicle motors and wind turbine generators?

Question 1 of 1

About three-fourths of the world’s cobalt, a metal required for electric vehicle batteries, is produced by which country?
🎲 More Indian Economy Practice
Was this helpful?

Beyond the answer

    Leave a Reply

    [privacy-do-not-sell-link]

    Discover more from MCQ Questions

    Subscribe now to keep reading and get access to the full archive.

    Continue reading

    ✨Ask doubt
    ✨ Ask a Question AI×
    [privacy-do-not-sell-link]