Menu

Thermal Power in India

One power station in Madhya Pradesh makes enough electricity for millions of homes, all by burning coal. This article covers thermal power in India: its history, its scale, and its pollution problem.

At a Glance

Four facts to hold on to.

01

Share

Coal supplies about 70% of India’s electricity.

02

Largest plant

Vindhyachal, Madhya Pradesh.

03

NTPC

Founded 7 November 1975.

04

Coal output

1 billion tonnes, FY 2024-25.

FGDFlue gas desulphurisation.
R&MRenovation and Modernisation.
DiscomState power distribution company.
CEACentral Electricity Authority.

Chapter 1: India’s Coal-Powered Backbone

Must Know

Timeline

  • 7 November 1975: the National Thermal Power Corporation (NTPC) is founded.
  • 1987: Vindhyachal commissions its first unit.
  • 2015: the government mandates FGD systems on coal plants to cut sulphur dioxide.
  • 20 March 2025: India crosses 1 billion tonnes of annual coal production for the first time, in FY 2024-25.
  • Today: coal supplies roughly 70% of India’s electricity.

The basics

  • Thermal power, mostly coal-based, is India’s single largest source of electricity.
  • NTPC is India’s largest power generator and runs 27 coal-based stations.
  • The Vindhyachal Thermal Power Station, in Singrauli district, Madhya Pradesh, is India’s largest thermal plant.
  • Fly ash and emissions of sulphur dioxide and oxides of nitrogen are the main pollution concerns.

Where the coal comes from

  • India holds the world’s fifth-largest coal reserves, an estimated 401 billion tonnes.
  • It is the world’s second-largest coal producer, behind only China.
  • Coal India Limited supplies roughly three-quarters of the nation’s coal.
Remember: Coal ≈ 70% of power. Vindhyachal = largest plant. NTPC = largest generator, 27 coal stations.

True or False: Vindhyachal, in Singrauli, Madhya Pradesh, is India’s largest thermal power plant.

Chapter 2: Plants, Ash and How It Works

Good to Know

Major plants

  • Vindhyachal has 4,760 MW of coal power, plus 15 MW of solar and 8 MW of hydropower.
  • That unusual mix puts thermal, hydro and solar on one site.
  • Mundra Thermal Power Station, owned by Adani Power, is the second-largest, at 4,620 MW.
  • The Sasan Ultra Mega Power Plant, also in Madhya Pradesh, has roughly 3,960 MW.
  • NTPC calls itself the power behind “every fourth light in India”.

Coal ash and coal quality

  • Coal ash contains heavy metals: arsenic, lead and mercury.
  • That is why its disposal and reuse are tightly regulated.
  • See Fly Ash.
  • Indian coal, mostly from Gondwana-era deposits, has high ash content, often 30–50% or more.
  • Imported coal from Australia or Indonesia is closer to 10–20% ash.

How a plant works

  • Pulverised coal burns in a boiler and heats water into high-pressure steam.
  • The steam spins a turbine, and the turbine’s shaft turns a generator.
  • After the turbine, the steam must be cooled back into water and returned to the boiler.
  • That cooling step is why thermal plants need huge, steady volumes of water.
Remember: Boiler → steam → turbine → generator → cooling → back to boiler.

True or False: Coal ash contains arsenic, lead and mercury.

Chapter 3: Scale, Costs and Water

Great to Know

Scale cuts both ways

  • A plant like Vindhyachal makes huge volumes of both electricity and fly ash.
  • India plans to add around 97,000 MW more coal and lignite capacity by 2034-35.
  • So India is not simply replacing coal. It is growing both coal and renewables to meet demand.

The FGD mandate

  • The FGD mandate was issued in 2015, with an original 2017 deadline.
  • The deadline has been pushed back repeatedly.
  • Most recently it moved to December 2026 for most plants and December 2027 for plants nearing retirement.
  • Compliance remains low nationally.
  • Vindhyachal is an exception NTPC highlights: all 13 coal units are on track for FGD by mid-2026.

Where new money is going

  • As of end-June 2026, NTPC’s under-construction renewable capacity (16.4 GW) passed its under-construction coal capacity (15.7 GW) for the first time.
  • This does not mean coal is shrinking. Existing coal capacity keeps growing.
  • NTPC still targets 26–27 GW of new coal capacity by 2032, alongside 60 GW of renewables.
  • It aims for roughly 149 GW total capacity by 2032 and 244 GW by 2037.

The cost gap

  • New coal projects selected by competitive bidding in 2025 came in at ₹5.38 to ₹6.30 per unit.
  • Solar in 2026 costs roughly ₹2.10 to ₹3.50 per unit, often under ₹2.50.
  • So new coal is often twice as costly as new solar.
  • Why add coal anyway? Solar and wind cannot yet guarantee round-the-clock power. Coal can.

A water-hungry industry

  • About 90% of India’s thermal generation depends on freshwater cooling.
  • Roughly 40% of thermal plants sit in regions with high water stress.
  • Between 2013 and 2016, 14 of the 20 largest thermal utilities had at least one water-shortage shutdown.
  • Those shutdowns cost about $1.4 billion.

Generators waiting to be paid

  • Discoms owed generators about ₹717.5 billion for the April 2025 billing cycle alone.
  • Total discom debt was near ₹7.26 lakh crore as of March 2025.
  • Legacy dues fell from about ₹1.39 lakh crore in 2022 to roughly ₹4,927 crore by January 2026.
  • That is a different, smaller number from the total outstanding dues. Do not confuse the two.
Think it through: Think it through: if coal costs more, why build it?

Cheap solar works only when the sun shines. Homes need power at night and in calm, cloudy weather. Coal can run on demand. So India pays more for coal to keep the lights steady.

True or False: New coal power is now cheaper than new solar per unit.

Chapter 4: Past Papers

Exam Point of View

CAPF (ACs) 2025: where is Ghatampur?

  • The Ghatampur Thermal Power Project is in Kanpur district, Uttar Pradesh, run by NLC India.
  • (Source: CAPF (ACs) 2025, Q8.)

CDS I 2023: how a thermal plant works

  • The question said burning fuel to heat water into steam, which spins a turbine, explains how a thermal station makes electricity.
  • Both parts are true, and the second explains the first.
  • (Source: CDS I 2023, Q90.)

UPSC CSP 2020: coal ash and coal plants

  • All three statements were correct: coal ash contains arsenic, lead and mercury.
  • Coal plants release sulphur dioxide and oxides of nitrogen.
  • Indian coal has high ash content.
  • These facts are often split across distractors. Learn all three together.
  • (Source: UPSC CSP 2020, Q79.)

UPSC CSP 2023: three “none of them” claims

  • The claims were that no coal plant uses seawater, none sits in a water-stressed district, and none is privately owned.
  • All three are false, because one genuine exception breaks a “none” claim.
  • The seawater-cooled example is the Tata Mundra Ultra Mega Power Project in Gujarat.
  • It is a different plant from Adani’s Mundra Thermal Power Station, though both are in the same port town.
  • See Coal Thermal Power Plants: Three “None of Them” Claims, All False.
  • (Source: UPSC CSP 2023, Q66.)

NDA & NA (II) 2025: who gets Vindhyachal’s power?

  • The question asked which state is not a beneficiary.
  • Gujarat, Goa and Maharashtra are. Uttar Pradesh is not.
  • A companion question matched plants to states, and only two of four pairs were right.
  • Panki is in Uttar Pradesh and Wanakbori is in Gujarat.
  • Parli is in Maharashtra, not Karnataka. The Vijayawada plant is in Andhra Pradesh, not Telangana.
  • Verify the real state before answering.
  • (Source: NDA & NA (II) 2025, Q129.)

NDA-NA-2 2017: where is Koradi?

  • Koradi Thermal Power Station is in Nagpur, Maharashtra.
  • It has run since 1974 and is one of four major plants serving the power-surplus Vidarbha region.
  • (Source: NDA-NA-2 2017 question.)

True or False: Koradi Thermal Power Station is in Nagpur, Maharashtra.

Chapter 5: Current Affairs

Current Affairs

Renovating 223 ageing coal units

  • On 6 August 2026, a Lok Sabha reply detailed the Renovation and Modernisation programme for ageing coal plants.
  • Under 2023 guidelines, the CEA identified 223 units older than 20 years as R&M candidates.
  • Together they represent 63,440 MW.
  • The upgrades run in nine phases, from January 2024 to June 2046.
  • The Centre does not fund this directly. Each generating company must finance its own R&M works.

Coal output and NTPC

  • On 20 March 2025, India’s annual coal production crossed 1 billion tonnes for the first time, in FY 2024-25.
  • The country produced about 1,047.52 million tonnes that year, with Coal India supplying the bulk.
  • The government now targets 1.5 billion tonnes a year by 2030.

Discoms still owe generators

  • As of the April 2025 billing cycle, discoms owed generators about ₹717.5 billion, per the PRAAPTI portal.
  • Their average payment delay improved to 113 days in FY 2025, from a high of 176 days in FY 2021.
  • The underlying debt burden remains large.

True or False: NTPC’s under-construction renewable capacity passed its coal capacity in June 2026.

Quick Q&A

NTPC founded?

7 November 1975.

Largest thermal plant?

Vindhyachal.

Coal share of power?

About 70%.

FGD mandate year?

2015.

R&M candidate units?

223.

0 / 5 correct

🎲 Practice: Thermal Power

8 verified questions from this topic.

Question 1 of 1

In which year was the National Thermal Power Corporation (NTPC) founded?

Question 1 of 1

Which is India’s largest thermal power plant?

Question 1 of 1

How many coal-based power stations does NTPC operate across India?

Question 1 of 1

Consider these two statements about India’s thermal power capacity plans.

Statement 1: India plans to add around 97,000 MW more coal and lignite-based capacity by 2034-35.

Statement 2: This expansion is happening instead of, not alongside, renewable energy growth.

Which statement(s) is/are correct?

Question 1 of 1

With reference to coal-based thermal power plants in India, consider:

1. None of them uses seawater.

2. None of them is set up in a water-stressed district.

3. None of them is privately owned.

How many of these statements are correct?

Question 1 of 1

Which coal-based thermal power project in Gujarat is a real example of a plant that uses seawater for cooling?

Question 1 of 1

The Ghatampur Thermal Power Project is located at [CAPF (ACs) 2025]

Question 1 of 1

As detailed in a Lok Sabha reply on 6 August 2026, how many coal-based thermal power units, older than 20 years, has the CEA identified as Renovation & Modernisation (R&M) candidates?
🎲 More Indian Economy Practice
Was this helpful?

Beyond the answer

    Leave a Reply

    [privacy-do-not-sell-link]

    Discover more from MCQ Questions

    Subscribe now to keep reading and get access to the full archive.

    Continue reading

    ✨Ask doubt
    ✨ Ask a Question AI×
    [privacy-do-not-sell-link]